Matte-black 40-yard roll-off dumpster staged on a framed-out residential construction site in Bronx, framing lumber stacked nearby, hooklift delivery truck visible in the background under bright Colorado daylight

Construction dumpster rental in Bronx

Need a jobsite dumpster for Bronx contractors? A 20-yard roll-off container arrives same day: swap-out included, driveway boards set up front.

Jobsite Roll-off Containers for General Contractors

Our construction fleet in the Bronx operates 20-, 30-, and 40-yard heavy-duty roll-offs built with reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers. Framers, roofers, and demo crews load each container with ease. We use driveway boards for every placement across Bronx, while managing ongoing contractor pricing and tonnage rates for multi-phase projects through our commercial recurring hauling agreements.

Matte-black 20-yard roll-off construction dumpster with heavy ribbed steel sidewalls and swing rear doors at a working jobsite in Bronx, sitting directly on compacted dirt with an unmarked white hauler partially visible at the far edge of the frame.

20-yard construction roll-off

A 20-Yard Roll-Off Dumpster measures 20 ft long, 7 ft wide, 4 ft tall and holds up to 2 tons included in the flat rate.

Our 20-yard roll-off fits kitchen and bath remodels, single-room demo, and small framing jobs in tight spaces.

Matte-black 30-yard roll-off construction dumpster sitting directly on the compacted-dirt site of a framed single-family home build in Bronx, drywall and lumber scrap loaded inside.

30-yard construction roll-off

The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons of capacity included.

The 30-yard container fits whole-house remodels, additions, and new-build framing while holding bulky drywall and lumber.

Matte-black 40-yard roll-off construction dumpster being lowered from a white-cab hooklift delivery truck onto the compacted-dirt jobsite at a commercial build site in Bronx

40-yard construction roll-off

The 40-yard roll-off measures 22 feet long, 8 feet wide, and stands 8 feet tall, with about 5 tons of debris included.

Sized for commercial builds and large tear-outs, the 40-yard roll-off is the largest container we stage on jobs.

Construction Debris, Drywall, Lumber Acceptance

Construction sites utilize our roll-off to manage mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. Everything gets sorted at the Bronx transfer station to ensure proper recovery—as outlined in the EPA construction debris recycling guidance. Many contractors manage these projects using commercial recurring hauling agreements, which help keep the container rotation steady for ongoing site work.

  • Framing lumber and offcuts
  • Drywall, plaster, lath
  • Subfloor and sheathing
  • Insulation and vapor barrier
  • Mixed packaging and pallets
  • Light metals and conduit
Worker in a yellow high-visibility vest tossing framing lumber and broken drywall into a matte-black 30-yard construction roll-off dumpster on an active build site in Bronx, bright daylight
Low-profile matte-black lowboy roll-off dumpster loaded with broken concrete slab and rebar at a foundation tear-out in Bronx, skid steer parked beside it, sunny Colorado morning

Concrete, Brick, and Asphalt Heavy-debris Pricing

Dense materials like concrete slab tear-out or clean dirt need the right container. Our reinforced-steel lowboy roll-offs handle brick demo, asphalt millings, and loads up to 10,000 pounds without issue. The low 2-to-3-foot side walls let skid steers and wheelbarrows dump straight over the rim without pushing past USDOT weight limits on Bronx routes.

Heavy-debris jobs run on weight tickets from the scale house, not on the yard; the cleanest loads — with no mixed wood, drywall, or trash — earn the lowest per-ton rate. I coordinate your container size and dispatch the dumpster based on a quick call with your site super regarding the expected tonnage.

Tonnage Limits and Weight Overage Policy

Every Construction Roll-Off includes a specific weight allowance for your debris: additional weight is billed at our per-ton overage rate verified at the scale-house. The total tonnage is clear on your upfront quote—so there are no surprises when the truck weighs in; heavy asphalt shingles require roofing tear-off jobsite containers to ensure they do not eat your mixed-debris allowance during the project.

20-yard

3 tons

Included tonnage. Mixed C&D debris.

30-yard

4 tons

Included tonnage. Mixed C&D debris.

40-yard

5 tons

Included tonnage. Mixed C&D debris.

On-site Swap-out and Dispatch Coordination

Multi-week jobs run on a swap-out rhythm; text or call dispatch when the roll-off is full — and we will drop a fresh container to the same staging pad across the Bronx metro the same or next business day.

Step 1

Text dispatch when full

Site supers text a photo and the container number to the dispatcher — no portal logins, no ticketing.

Step 2

Same- or next-day swap

We haul your full container to the staging pad and drop an empty in the same spot so your crew never loses a loading hour.

Step 3

Weekend dispatch available

Saturday pulls keep Monday starts clean; coordinate Friday afternoon for weekend turns.

Insurance and Contractor Account Setup

We issue certificates of insurance to the GC or owner; contractor accounts run on net-30 with consolidated monthly billing across active sites in Bronx — the hooklift fleet stages the recurring containers. Call dispatch and the net-30 account spins up in one call.